Concrete Bag Calculator

Concrete Bag estimates for project planning. Use bag yield printed on the package.

Project dimensions

20 ft10 ft4 in

Your estimate

Concrete required

2.716 yd³

Volume before waste
66.667 ft³
Bags required
123 bags
Ready-mix material cost
$407.407

Illustrative defaults, not market quotes. Verify supplier quantities and local requirements. Not structural design advice.

How to use this calculator

Use bag yield printed on the package.

Calculation formula

Bags = round up(adjusted cubic feet ÷ bag yield).

Worked example

Using length 20 ft, width 10 ft, thickness 4 in, waste allowance 10 %, material price 150 $/yd³, bag yield 0.6 ft³, the estimate is 2.72 yd³ (concrete required); 66.67 ft³ (volume before waste); 123.00 bags (bags required); 407.41 $ (ready-mix material cost).

Can I use this as a purchase quote?

No. Verify supplier minimums, product specifications, taxes and additional work before ordering.